12
ENIGMA-X / SPARKLE manual Ver 6 Rev 4 07/2016
1
2
Ø5/16
”
(8mm)
1
2
4**
3**
Ø3/8
”
(10mm)
see Note
3
Fig 11
4*
Fig 12
Separate the
Guide Rail Bracket (#08)
sleeve from the base by loosening the set
screws (leave the sleeve on the upper
guide rail)
Ø3/8
”
(10mm)
see Note
5**
6**
base
sleeve
11.
Drill a hole for the
Wall bracket (#19)
using a
Ø5/16”
(8mm)
drill bit and insert the
Wall anchor (#9b)
(FIG. 12.1 &
12.2).
Drill the holes for the
Guide Rail brackets (#08)
using a
Ø3/8” (10mm)
drill bit and insert the
Wall anchors (#9a)
.
(FIG 12.3...12.6)
**.
If mounting into a stud (recommended), drill a Ø1/4” hole
and do not use the wall anchors (see note above).
See Fig 12 for details
10.
After marking the positions of all the hardware, set the
Stationary glass (#02)
with the
Upper Guide Rail (#03)
aside.
(If installing the 72” model, also remove the
Small stationary
panel glass (#23)
from the
Upper Guide Rail (#03)).
Remove the
Guide Rail Brackets (#08)
from the
Upper Guide
Rail (#03)
and the
Wall bracket (#19)
from the
Stationary
glass (#02)
. Place the
Wall bracket (#19)
and
Guide Rail
Brackets (#08)
back to the outlined positions and mark the
holes for drilling.
*NOTE:
If installing the 72” model, perform the same procedure
on the opposite wall to mark the
Wall bracket (#19)
for the
Small stationary panel glass (#23).
(Fig 11.4*)
See Fig 11 for details
**NOTE:
Step #11 has an option for installing the guide rail
brackets to the wall using anchors. However,
the manufacturer
strongly recommends installing these heavy doors to the
studs or to pre-installed 2x6 wood reinforcements behind
the wall in the area where the guide rail brackets will be
attached to the wall.
**For the recommended installation into a stud, drill a Ø1/4”
hole up to the stud and let the screw bore into the wood.