Page 13
Hydro Systems Co. 2019
HYD10099044 Rev 1.4
6. set up
Plumbing and power has been correctly connected according to the installation section. Once this is complete:
•
Open the isolation valve connecting the EvoBoost to the water main.
•
Allow the EvoBoost water reservoir to fill (this can take up to 15 minutes depending on water inlet flow).
•
Check for leaks in the system plumbing on the inlet side of the unit.
•
Turn on the power to the EvoBoost. The pump will activate, and you will hear it running.
•
With a pressure gauge, check the delivery pressure on the EvoBoost when the valve on the destination device is open.
The water pressure during delivery must be below 4.8 bar (70 psi) or there is too much backpressure for the pump to
operate properly.
•
The plumbing between the EvoBoost and EvoClean will pressurise until the pressure switch on the pump cuts out.
•
Check for leaks in the system plumbing between the EvoBoost and EvoClean.
•
Using the ‘prime chemicals’ feature on the EvoClean, operate the flush valve for approximately 30 seconds to flush
through any trapped air in the system.
•
Repeat this process with all EvoClean units in the system (up to 3).
EvoBoost
The EvoClean setup should be followed in the ‘EvoClean Installation and Operation manual’, this gives a more comprehensive
setup of the system. Once the EvoClean unit has been programmed correctly, the following quick start steps can be taken:
•
Prime each chemical to the top of each chemical pickup tube.
•
Calibrate each chemical to ensure that the dosage is accurate.
EvoClean
Содержание HYDRO EvoBoost
Страница 1: ...user manual EvoBoost ...