Page 7
Hydro Systems Co. 2019
HYD10099044 Rev 1.4
[19.5]
496
[19.3] 490
[10.4]
264.6
5. installation
The tools that are required to complete the installation are:
Flat Head
Safety
•
Please read section 1 – Safety, carefully, prior to installation, to ensure all precautions have been adhered to.
•
The unit must be installed by a trained Engineer.
•
Any electrical work must be carried out by a trained electrician according to applicable electrical codes & regulations.
•
Ensure all plumbing is installed in accordance with applicable codes & regulations.
•
Ensure overflow on unit is connected to a drain point
Prior to installation, complete a site survey to ensure that the proposed site meets the following requirements:
•
Ensure the flooring to mount the EvoBoost is of solid construction, stable, level and can accommodate the weight of
the product when filled with water (~26kg/57lbs).
•
There is a 115 / 230V mains supply available within 3 meters (10ft) of the installation location.
•
There is a mains water supply available within 2 meters (6.5ft) of the installation location and can provide a minimum
Inlet flow of 6Lpm (1.6 GPM) at 1 Bar (14.5 psi) pressure. Water pressure shall not exceed 6 bar (87 psi).
•
There is sufficient room for installation of the EvoBoost.
•
EvoClean units are / can be installed as per the dimensional requirements listed in the installation section in this manual
•
There is a drain point near the EvoBoost to allow for the overflow to be connected.
5.1 Site services and installation requirements
Содержание HYDRO EvoBoost
Страница 1: ...user manual EvoBoost ...