![Dorner 6100 Series Скачать руководство пользователя страница 5](http://html1.mh-extra.com/html/dorner/6100-series/6100-series_installation-maintenance-and-parts-manual_2523160005.webp)
6100 Series Industrial End Drive Conveyors Installation, Maintenance & Parts Manual
Dorner Mfg. Corp.
5
851-268 Rev. F
Required Tools
Standard Tools
D
Hex key wrenches
– 4 mm
– 5 mm
D
Level
D
Torque wrench
Recommended Installation Sequence (see
Table of Contents for page number)
D
Assemble conveyor (if required)
D
Attach mounting bracket(s) with return roller to
conveyor (see page 6)
D
Install stands (see accessory instructions)
D
Attach conveyor to stands
D
Mount gearmotor mounting package (see accessory
instructions)
D
Attach guides/accessories (see “Service Parts” sec-
tion, pages 20 through NO TAG)
Conveyors Up to 13 ft (3962 mm)
No additional assembly is required.
Conveyors Longer Than 13 ft (3962 mm)
1
.
Typical components (Figure 4)
Figure 4
O
P
Q
N
2
.
Compress tension end (Figure 5). Refer to steps 3,
4 & 5 under the “Belt Removal for Conveyor
Without Gearmotor Mounting Package or Stands”
on page 9.
Figure 5
3
.
Roll out conveyor belt.
4
.
Place conveyor frame (N Figure 6) into belt loop.
Figure 6
N
5
.
Join conveyor sections (N and Q of Figure 7). Install
screws (O) on both sides. Tighten to 60 in-lb (7 Nm).
Figure 7
O
N
Q
6
.
Tension conveyor belt.
Refer to “Conveyor Belt
Tensioning” on page 12.
Installation