![Dorner 6100 Series Скачать руководство пользователя страница 14](http://html1.mh-extra.com/html/dorner/6100-series/6100-series_installation-maintenance-and-parts-manual_2523160014.webp)
6100 Series Industrial End Drive Conveyors Installation, Maintenance & Parts Manual
851-268 Rev. F
14
Dorner Mfg. Corp.
Figure 33
AP
3
.
Remove tail assembly (AQ of Figure 34).
Figure 34
AQ
4
.
Locate magnet (AR of Figure 35). Remove screw
(AM).
Figure 35
AM
AR
AS
AT
5
.
Remove headplate (AS).
6
.
Remove pulley (AT).
C
– Removal of Idler Pulley with Tool-less Belt
Release
1
.
Remove handle(AU of Figure 36).
Figure 36
AP
AU
2
.
Remove two (2) screws (AP of Figure 36).
3
.
Remove two (2) screws (AP of Figure 37). Remove
handle assembly (AV).
Figure 37
AP
AV
AQ
4
.
Remove tail assembly (AQ).
5
.
Locate magnet (AR of Figure 35). Remove screw
(AM).
6
.
Remove headplate (AS).
7
.
Remove pulley (AT).
D
– Gang Drive Pulley Removal
1
.
Remove the two (2) screws (AW of Figure 38).
Figure 38
AW
AW
AX
AY
AZ
AX
AY
BA
Preventive Maintenance and Adjustment