![Dorner 6100 Series Скачать руководство пользователя страница 16](http://html1.mh-extra.com/html/dorner/6100-series/6100-series_installation-maintenance-and-parts-manual_2523160016.webp)
6100 Series Industrial End Drive Conveyors Installation, Maintenance & Parts Manual
851-268 Rev. F
16
Dorner Mfg. Corp.
3
.
Slide the sleeve of tool (part # 450282) (BH of Figure
44) over bearing.
Figure 44
BH
4
.
Place open end of shaft (BI of Figure 45) into sleeve.
Figure 45
BI
5
.
Using arbor press or similar device, press bearing onto
pulley shaft (see Figure 46).
Figure 46
6
.
Repeat steps 1 through 5 for each bearing.
Bearing Replacement for Gang Drive Pulley
IMPORTANT:
Once removed, do not re-use
bearings.
Bearing Removal
NOTE:
The bearings of a 2¨ (44 mm) wide gang drive
pulley cannot be replaced. Order pulley assembly
(part # 454702).
1
.
Insert bearing removal tool (part # 25-05
k
) (BK of
Figure 47) into the pulley (BN) until shoulder (BJ) seats
against bottom of bearing (BO).
Figure 47
BJ
BL
BM
BN
BO
BK
2
.
While holding bearing removal tool (BK) in posi-
tion, insert extension tool (part # 25-08
k
) (BL) into
opposite end of pulley (BN). Rotate bearing removal
tool (BK) to engage hex tip of extension tool (BL)
into screw (BM).
3
.
While maintaining extension tool (BL) position, use
a wrench to rotate bearing removal tool (BK) to
expand flare.
Figure 48
BL
BK
4
.
Orient bearing anvil/sleeve removal tool (part #
25-09
k
) (BP of Figure 49) with cavity facing up and
place pulley onto tool.
Preventive Maintenance and Adjustment