OP000509
4-37
Inspection, Maintenance and Adjustment
B.
Bucket lever connecting pins, 2 locations. Lever
link connecting pins, 2 locations. Bucket cylinder
rod ends, 2 locations. (Figure 47)
C.
Bucket cylinder heads, 2 locations. Arm lever
connecting pins, 2 locations. Lever link connecting
pins, 2 locations. (Figure 43)
Link foot pins, 2 locations.
D.
Lift cylinder heads (left, right), 2 locations. Lift
cylinder rod ends, 2 locations. (Figure 49)
E.
Remote location points.
Remote fittings for loader arm foot end (50
HOUR),
(Figure 50).
FG008097
Figure 47
FG008098
Figure 48
FG008099
Figure 49
FG008100
Figure 50
Содержание DL200
Страница 2: ......
Страница 6: ...K1024537E Table of Contents IV ...
Страница 7: ...K1024537E I I Presentation 1Presentation PRESENTATION FG008047 Figure 1 ...
Страница 17: ...OP000506 1 5 Safety 1 3 10 12 6 4 11 5 9 8 3 7 10 9 4 6 2 FG008049 Figure 1 ...
Страница 60: ...OP000506 Safety 1 48 ...
Страница 112: ...OP000507 Operating Controls 2 52 CD Player Optional AST DIR FG000109 Figure 101 ...
Страница 122: ...OP000507 Operating Controls 2 62 ...
Страница 232: ...OP000509 Inspection Maintenance and Adjustment 4 88 ...
Страница 242: ...OP000040 Troubleshooting 6 8 ...
Страница 252: ...OP000510 Specification 7 10 ...