MAN05MGO5
INSTRUCTIONS JIB CRANE SERIES GBA - GBP
INDEX
1. PRELIMINARY INFORMATION
1
1.1 Contents and use of the manual
1
1.2 Symbols: meaning and use
1
1.3 Co-operation with the user
2
1.4 Conformity with safety regulations
2
1.5 The manufacturer’s responsibility and the warranty
3
2. DESCRIPTION OF THE MACHINE AND TECHNICAL INFORMATION
4
2.1 The manually rotated jib crane
4
2.1.1 Intended use - Foreseen use - Designated use
4
2.1.2 Constraints when installing
4
2.1.3 The composition of the jib cranes
4
2.2 Technical information and service conditions
7
2.2.1 Safety reference list
7
2.2.2 Protection and insulation of electrical parts
7
2.2.3 Electrical power supply
7
2.2.4 Environment conditions of use
7
2.2.5 Noise - Vibrations
8
2.2.6 Criteria of use and conditions of use
8
2.2.7 Characteristics and technical data - Weights - Reactions on constraints
9
3. SAFETY AND ACCIDENT PREVENTION
14
3.1 Qualifications of qualified operators
14
3.2 General safety regulations
15
3.3 Safety symbols
15
3.4 Warning about remaining risks
16
3.5 Safety measures and instructions
17
3.5.1 Control devices
17
3.5.2 Safety and emergency devices
17
3.5.3 Warning and signalling devices - List of labels
18
4. HANDLING - INSTALLATION - PUTTING INTO OPERATION
19
4.1 General notes at delivery
19
4.2 Packing, transportation and handling
20
4.2.1 Standard packing
20
4.2.2 Transportation
20
4.2.3 Handling
21
4.2.4 Removing the packing and/or check of the crane parts
21
4.3 Installation of the jib crane
22
4.3.1 Duties and responsibilities of the installer
22
4.3.2 Preparing the place of installation
23
4.3.3 Assembly of the column – For GBA column-mounted cranes
24
4.3.4 Assembly of the bracket – For GBP wall-mounted cranes
26
4.3.5 Assembly of the arm – For GBA column-mounted cranes and GBP wall-mounted cranes
28
4.3.6 Assembly of the electric system with the connector block
29
4.3.6.1 Assembly of the electric system with isolating switch for GBA column-mounted cranes
30
4.3.7 Assembly of the trolley/hoist
31
4.4 Putting the machine into operation
32
4.4.1 Preliminary operations – Adjustments and test runs
32
4.4.2 Inspection of the jib crane – Suitability for use
33
4.5 Out of service
35
4.5.1 Storage and conservation of parts
35
4.5.2 Reuse after storage
35
KMAN05MG05
KMAN05MG05