RF Baghouse, Models RFWP and RFWPH
24
3. Locate the three 66-in tall partial width body panels. Do
not use panels with interior gussets, which are used for
the top ring.
4. Set the first 66-in partial width body panel onto the tube
sheet (do not apply sealant to the tube sheet) to the right
of the inlet transition.
Take precaution against pinching
when handling and installing one
body panel to the next.
first ring
body panel
second ring
body panel
third ring
body panel
partial width
body panel
high inlet
transition
cross
bracing
panel with
interior gusset
Dirty Air Plenum Assembly (776/851 Size shown)
5. For Non-Explosion Vented Dirty Air Plenum: Locate a
standard 66-in tall panel and place it in the next, counter-
clockwise position relative to the first partial width panel.
Join panels following instructions below. Continue placing
standard panels until the space for the high inlet is all that
remains.
For Explosion Vented Dirty Air Plenum: For the
570RFWPH model, locate a standard 66-in tall panel and
place it in the next, counter-clockwise position relative to
the first partial panel. Join following