23
Donaldson Company, Inc.
Dirty Air Plenum with High Body Inlet
Assembly
1. Locate the high inlet transition and attach the temporary
cross bracing with the provided nuts and bolts.
2. Set the high inlet transition on the tubesheet (do not apply
sealant to the tubesheet) so it lines up with the blank
portion of the tubesheet that will not have bags installed.
Use the tube sheet to help align the panels until all is
assembled.
Note: Not applicable to involute inlet.
high inlet
transition
tube sheet
cross
bracing
High Inlet Transition Installation