
PART 3 INSTALLATION
UNPACKING
Remove the controller, print heads and accessories (e.g. encoder and sensor) from the
packaging.
The equipment delivered will vary according to the specific order. Check the contents of the
shipment against the packing list and report any differences to Domino.
LOCATION
Position the equipment:
•
Where they are electrically isolated from other equipment.
•
•
Where the temperature remains within the specified range, see
.
•
•
Where the relative humidity remains within the specified range, see
Specification on page
•
22
.
•
Close to an accessible power outlet, to ensure power can be disconnected quickly.
•
•
Where access to pipes, cables and electrical connections is not blocked.
•
INSTALLATION
38
EPT077343 EN - Issue 1 - 11 November 2022
Содержание G Series
Страница 1: ...G Series Product Manual G50i ...
Страница 42: ...7 Fit the print head 7 INSTALLATION 42 EPT077343 EN Issue 1 11 November 2022 ...
Страница 46: ...7 Fit another round bar 7 8 Fit the controller 8 INSTALLATION 46 EPT077343 EN Issue 1 11 November 2022 ...
Страница 104: ...2 Open the latch and remove the ink cartridge 2 OPERATION 104 EPT077343 EN Issue 1 11 November 2022 ...
Страница 117: ...Name Description Content Displays a preview of the database object OPERATION EPT077343 EN Issue 1 11 November 2022 117 ...
Страница 121: ...Name Description Content Displays a preview of the database object OPERATION EPT077343 EN Issue 1 11 November 2022 121 ...
Страница 167: ...MAINTENANCE TROUBLESHOOTING EPT077343 EN Issue 1 11 November 2022 167 ...
Страница 170: ...MAINTENANCE TROUBLESHOOTING 170 EPT077343 EN Issue 1 11 November 2022 ...
Страница 171: ...EPT077343 EN Issue 1 11 November 2022 171 ...