2.3.3. Doors
The RAP Opticooler has two doors while the RKN Opticooler has one door. These doors can be
opened to approx. 270° and have to be secured with the provided door holders when completely
opened. The door handles can be sealed.
2.3.4. Equipment Compartment
The equipment compartment contains the aggregates as well as the control system and is not
accessible. It must only be opened by personnel authorized by DoKaSch for maintenance and
repair.
2.3.5. Charging Unit
The container is equipped with two independent charging units. The power is supplied via the
external CEE coupling.
Fig. 2.9 CEE coupling charging unit
Fig. 2.11 Electrical requirements
Fig. 2.10 CEE coupling charging unit