SECTION 1 - SAFETY

1.1 Safety statement

1.2 Safe working practices and staff training

1.3 Dust explosion hazard

1.3.1 NFPA 654 and referenced codes and standards

The air cleaning equipment supplied by Diversitech ranges from very large multiple-component assemblies which require significant and complex, 
rigging, handling and assembly on-site, to small compact assemblies that are easily handled and maneuvered. In addition to size, many of the dust 
collectors will require electrical connections, compressed air connections, and will feature high speed rotating equipment.
At all times, when dealing with industrial equipment such as dust collection equipment personnel safety must be the highest priority of all involved, 
from riggers, installers, operators, users, and maintenance personnel. Those responsible on-site shall review the details of the equipment beforehand 
and develop a plan for dealing with all stages of the installation from receipt of the equipment on-site to start-up, commissioning, and hand-over. All 
applicable health, safety, and environmental (“HSE”) rules, regulations and legislation shall be fully complied with at all times.

By its very nature the Typhoon Central Dust Collector is intended to be used to capture airborne particulate matter, otherwise known as dust.
Many dusts have the potential to be explosive. Dust explosions constitute a serious industrial hazard and may result in death, serious injury, and 
devastating property damage. It is the responsibility of the user to identify the nature of the dust generated during any process or activity, whether or not 
it poses an explosive hazard, and to properly mitigate this hazard.
Except as otherwise expressly provided in writing, Diversitech makes no representation or warranty in connection with explosion hazard equipment, 
including, but not limited to, the necessity or effectiveness of explosion hazard equipment or to the design, installation, operation, and performance of 
such equipment.
The basic standards for dealing with explosive dust applications are published by the National Fire Protection Agency (“NFPA”). The user shall be fully 
conversant with the provisions of the particular codes and standards that apply to the specific application and equipment used, and shall comply in full 
with all of the requirements of the applicable codes and standards.

The owner shall review and comply with 

NFPA 654: Standard for the Prevention of Fire and Dust Explosions from the Manufacturing, 

Processing, and Handling of Combustible Particulate Solids

, and those other documents referenced therein. NFPA 654 pertains to “all 

phases of manufacturing, processing, blending, conveying, repackaging, and handling of combustible particulate solids or hybrid mixtures, 
regardless of concentration or particle size, where the materials present a fire or explosion hazard”. The purpose of the standard “is to prescribe 
technical requirements for safety to life and property from fire and explosion and to minimize the resulting damage from a fire or explosion”. 
The user shall be fully conversant with the provisions of NFPA 654 and shall comply in full with all of its requirements and those of all applicable 
referenced codes and standards.
Note that NFPA 654 does not apply to the specific applications or materials covered by the other NFPA documents unless specifically 
referenced by those documents.

Diversitech is fully committed to the safety of its employees and those of its customers. In this spirit the following guidelines are offered for the 
consideration of those responsible:

 

• All personnel shall receive safety training specific to the site, the task, and the conditions under which the work will be conducted.

 

• All personnel shall be equipped with appropriate safety apparel and equipment, such as clothing, footwear, hard-hats, gloves, ear protection, 

eye protection, and safety harness.

 

• All personnel involved in any stage of the process shall have been trained for the tasks in which they will be involved and at all times shall be 

under the direct supervision of experienced supervisors and managers.

 

• All personnel shall be equipped with appropriate tools and equipment to safely and efficiently complete their task.

 

• Adequate lighting shall be supplied at all times while work is being conducted.

 

• A work perimeter shall be set up to define the limits of the area within which the work will be conducted and outside which there will be 

no threat to the safety of personnel or plant. The perimeter shall be taped-off and marked appropriately to prevent accidental ingress of 
uninvolved personnel or equipment. When the work area impedes into existing access ways or traffic routes for which no practical alternative 
is available, barriers, wardens and flaggers shall be employed to safely control crossing traffic and personnel.

 

• At any time only those personnel directly involved in completing the task at hand shall be allowed within the work perimeter.

Содержание Typhoon TY-10000

Страница 1: ...intenance Manual TYPHOON CENTRAL DUST COLLECTOR Visit our Website for more information on this product www diversitech air com www diversitech ca 1200 55th Avenue Montreal Quebec H8T 3J8 Tel 1 800 361...

Страница 2: ...rk Installation 18 SECTION 9 WATER LEVEL CONTROL OPTIONS 19 SECTION 10 START UP OPERATION 19 10 1 Principles of Operation 19 10 2 Controls 19 10 3 Water Level Monitoring 20 10 4 Alarms 20 10 5 Level S...

Страница 3: ...and comply with NFPA 654 Standard for the Prevention of Fire and Dust Explosions from the Manufacturing Processing and Handling of Combustible Particulate Solids and those other documents referenced t...

Страница 4: ...r incorporates a fan which is close coupled and installed on top of the Typhoon Central Dust Collector or installed separately typically ground mounted and ducted to the outlet of the Typhoon Central...

Страница 5: ...non metallic materials that may not present an explosion hazard As mentioned the Typhoon Central Dust Collector is primarily particularly effective for the collection of dust generated by the working...

Страница 6: ...he make up water connection or by electrical controls that automatically add water as needed to compensate for evaporation and water lost as the collected dust is removed from the unit The Diversitech...

Страница 7: ...the load and strapping it to the handling device Care shall be taken to ensure that the equipment is not dropped or subjected to any impact loads Any missing goods should be noted on the delivery rece...

Страница 8: ...ppropriate hoisting procedure should be followed according to 5 3 Rigging and Hoisting Instructions 5 6 Middle Section Hoisting Hoisting must be done from the hoist mounts Appropriate hoisting procedu...

Страница 9: ...Appropriate hoisting procedure should be followed according to 5 3 Rigging and Hoisting Instructions 5 8 Motor Blower Hoisting Hoisting must be done from the hoist mounts Appropriate hoisting procedur...

Страница 10: ...ations and anchor bolts When locating the Typhoon Central Dust Collector the design engineer shall consider the many factors associated with site selection including but not limited to seismic design...

Страница 11: ...Top section Blower and Motor assembly 8 2 Foundation Installation and Levelling Prepare the foundation by drilling anchor bolt holes according to the supplied dimensional drawings Install the Typhoon...

Страница 12: ...hoisting instructions from Section 6 Field assembly of these sections will be as follows If the baffles of the middle section were shipped separately they will need to be installed prior to mounting...

Страница 13: ...flange to create a gasket with the middle section Lower the middle section carefully onto the flange of the hopper section watching for interference between intermediate sheets and baffles Set the cle...

Страница 14: ...g the flange between the Typhoon Central Dust Collector middle section and the clean air transition section Locate the middle section top flange and wipe clean Place sealant tape or a thick constant b...

Страница 15: ...er and motor can be installed As previously noted see section 8 3 the motor and blower supplied for Typhoon Central Dust Collector ships separately for installation at the jobsite With the clean air s...

Страница 16: ...ill be provided with the Typhoon Central Dust Collector and will need to be installed on site Connect water inlet L piping Connect the water inlet solenoid Connect the blue pressure hose to the water...

Страница 17: ...e and green wires in accordance with wiring diagram Run water level sensor wire cable to the control box and see section 8 8 for electrical connection Secure the electrical cable to body with cable cl...

Страница 18: ...yphoon Central Dust Collector to the customer s drain line or sewer The customer s drain or sewer line MUST be equal to or larger in size to the drain from the Typhoon Central Dust Collector For the f...

Страница 19: ...uct is designed to capture potentially combustible dust particulate from certain industrial applications using a wet filtration process When operating air and dust is drawn into the table passes throu...

Страница 20: ...el will be heard When one of these alarms is present the machine will lock down and will not allow to be started Motor Overload if the main motor overload is tripped The alarm will remain until the si...

Страница 21: ...3 to modify the set point value If no key is pressed within 5 seconds the interface will go back to the main screen To set the level lower limit the button 3 can be pressed Then use the button 2 and 3...

Страница 22: ...cket within 20 seconds 8 Wait until the sensor flashes and changes color 9 Reinstall probe on sensor box 1 Press button 2 2 Using up down keys set the alarm to 95 3 Wait 5 seconds for the reading to b...

Страница 23: ...e in your application turn the unit ON and perform a function test To do so 1 Turn switch to ON position 2 LOOK Is the unit level stable and that nothing is obstructing the extraction path Is there ad...

Страница 24: ...Water Level Control Box see Section 11 2 Pre Use Checklist Every 1 Month or Specific Cleaning Cycle Exchange Water 1 Remove the water using the drain outlet considering 2 Drained material should be k...

Страница 25: ...he static pressure directly upstream of the inlet of the Typhoon Central Dust Collector from the static pressure directly downstream of the exhaust plenum between the Typhoon Central Dust Collector an...

Страница 26: ...26 12 4 Troubleshooting Procedure...

Страница 27: ...maintenance on unit including filter inspection The input power to this unit is high voltage and touching any live electrical parts can cause fatal shocks or severe burns Do not touch live electrical...

Страница 28: ...bicolor LED D rapidly flashes green 5 Releases the button The bicolor LED continues to flash green 6 Within 30s insert an object into position 1 then push and release the setup button The bicolor LED...

Страница 29: ...29 NOTES...

Страница 30: ...are integrated with any products equipment units connections and or systems of a third party Third Party Products we hereby expressly exclude all of the following warranties express or implied namely...

Страница 31: ...Order is for a customized product including without limitation any custom engineered product and b an event set forth at Section 5 2 hereof occurs you will be responsible for payment of the entire amo...

Страница 32: ...An Absolent Group Company 1200 55th Avenue Montreal Quebec H8T 3J8 Email info diversitech ca For full product support visit our website https bit ly 2P6CGBX Scan above on mobile...

Отзывы: