![DIVERSITECH Typhoon TY-10000 Скачать руководство пользователя страница 14](http://html1.mh-extra.com/html/diversitech/typhoon-ty-10000/typhoon-ty-10000_operation-and-maintenance-manual_2510748014.webp)
14
8.4 Foundation Installation and Levelling
With the middle section installed on the hopper, the clean air transition section can
be installed. Follow hoisting instructions from
section 6
As previously noted (see
section 8.3
), the clean air transition supplied for the
Typhoon Central Dust Collector ships separately for installation at the jobsite. The
gasket will be a bead of silicone material for sealing the flange between the Typhoon
Central Dust Collector middle section and the clean air transition section.
Locate the middle section top flange and wipe clean
Place sealant tape or a thick constant bead of silicone around the middle section external flange to create a gasket with the clean air section.
Lower the clean air section carefully onto the flange of the middle section, watching for interference. Set the clean air section in place so that its bolting
flange matches the middle flange.
Bolt the outside flanges of the clean air section and middle
section with bolt, washer, washer, lock washer, nut
Содержание Typhoon TY-10000
Страница 26: ...26 12 4 Troubleshooting Procedure...
Страница 29: ...29 NOTES...