DINO 260XT
62
-
check the play of the turning gear
-
check the tightness of the turning bearing attachment screws
-
M16 280 Nm M12 150 Nm
-
check the attachment of the turning motor
-
check the condition of the chassis
-
general condition
-
check the attachment of the tow-bar to the chassis
-
check the condition of the overrun and its attachment to the chassis.
-
check the axle and its attachment to the chassis
-
check the attachment and condition of the brake wires and rods
-
check the rims, the tightness of the wheel bolts, the tyres and the tyre pressure
-
check the condition of the driving device, attachment of the parts and condition of the
covers for electric components
-
check the condition of the transport support of the boom
-
perform a test run, test all operating controls, control the outreach with a load of 80 kg on the platform
according to the instructions on page 50
-
also check the operation of the limit switches during the test run (refer to the service instructions)
-
the load-sensing limit switches on the safety devices
-
the limit switches on the outriggers, which prevent the operation of the boom movements
-
the limit switches on the tow-bar, which prevent the use of the outriggers
-
after the test-loading make sure that the test loading has not caused any defects, such as fractures or
permanent deformations of dangerous nature, on the steel structures or other loaded parts
-
draw up a protocol of the regular inspection with following articles:
1.
inspection form
2.
data of repair weldings
a)
date of repair
b)
repaired by whom
c)
what was repaired
-
as the machine is ready for operation after the annual inspection, mark the inspection date on the
inspection plate affixed to the lift
EXTRAORDINARY INSPECTION
(INSPECTION AFTER AN EXCEPTIONAL SITUATION)
The inspection is required if the lift has been damaged in a manner which may affect its load-
bearing capacity or safe operation.
-
in this case the lift shall be inspected according to the instructions for the
annual inspection
-
the lift shall be subjected to a test loading and a stability test
-
a protocol shall be drawn up for the inspection
Содержание DINO 260XT
Страница 2: ...DINO 260XT 2...
Страница 3: ...DINO 260XT 3 OPERATING INSTRUCTIONS Valid from serial number 26121...
Страница 6: ...DINO 260XT 6 REACH DIAGRAM...
Страница 12: ...DINO 260XT 12...
Страница 14: ...DINO 260XT 14 28L 28 28R 13 14 12 15 6 16 1 5 32 2 29 3 31 4A 10 34 7 33 8 9 11 4B...
Страница 16: ...DINO 260XT 16 30A 26 25 23 20 36 18 22 30B 35 24 19 17 21...
Страница 22: ...DINO 260XT 22 28L 28 28R 13 14 12 15 6 16 1 5 32 2 29 3 31 4A 10 34 7 33 8 9 11 4B...
Страница 24: ...DINO 260XT 24 24 30A 26 25 23 20 36 18 19 22 17 21 30B 35...
Страница 40: ...DINO 260XT 40 LUBRICATION PLAN...
Страница 42: ...DINO 260XT 42 1...
Страница 81: ...DINO 260XT 81...
Страница 82: ...DINO 260XT 82 ELECTRIC DIAGRAM 26094...
Страница 83: ...DINO 260XT 83...
Страница 84: ...DINO 260XT 84...
Страница 85: ...DINO 260XT 85...
Страница 86: ...DINO 260XT 86...
Страница 87: ...DINO 260XT 87...
Страница 88: ...DINO 260XT 88...
Страница 89: ...DINO 260XT 89...
Страница 90: ...DINO 260XT 90...
Страница 91: ...DINO 260XT 91...
Страница 92: ...DINO 260XT 92...
Страница 93: ...DINO 260XT 93...
Страница 94: ...DINO 260XT 94...
Страница 95: ...DINO 260XT 95...
Страница 96: ...DINO 260XT 96...
Страница 97: ......
Страница 99: ...DINO 260XT 99 HYDRAULIC DIAGRAM BOOM SYSTEM 26102...
Страница 100: ...DINO 260XT 100...
Страница 101: ...DINO 260XT 101 Notes...