Gate preparation
Be sure the gate is properly installed and slides smoothly before installing
the D-FORCE600VA sliding gate operator. The gate must be plumb, level,
and move freely.
Conduit
In order to protect the cable, use PVC conduit for low voltage power cable
and control wires. Conduit must be preset into the concrete when it is
poured. Wires within the conduit shall be located or protected so that no
damage can result from contact with any rough or sharp part.
Concrete pad
The base unit of the gate operator requires a concrete pad in order to
maintain proper stability. The concrete pad should be approximately
450mm x 300mm x 200mm deep in order to providing for adequate weight
and structure to insure proper stable installation.
Anchors (see Fig.2)
You can use anchor bolts, anchors, washers and nuts. These anchors must
be set into the concrete when it is poured or you can use wedge anchors to
5