![Dickey-John INTELLIAG AI-120 Скачать руководство пользователя страница 148](http://html1.mh-extra.com/html/dickey-john/intelliag-ai-120/intelliag-ai-120_operators-manual_2494937148.webp)
OPERATOR’S MANUAL
AI-120 Virtual Terminal
11001-1606E-201703 Rev B
VARIABLE RATE JOB SETUP / 141
VARIABLE RATE JOB SETUP
Variable rate control job data is created using a farm management software
tool and is imported to the terminal via a USB memory device. Automatic
rate adjustment occurs when entering different zones in the prescription
map when variable rate is enabled. Variable rate control can be enabled
and disabled via the terminal and can only be used when planter, air cart,
NH3, or granular control features are enabled.
IMPORTANT: An exact file structure must be followed for the terminal
to accept the data.
INITIAL IMPORT OF JOB DATA
Any new data for import to the terminal from a farm management software
tool requires the following steps before transfer to a USB memory device.
Farm Management Software Requirements
:
The below steps are an example when using FarmWorks software. Steps
1-7 may differ based on the farm management software used.
1. At the Write Job Data screen, select “DICKEY-john” as the type.
2. Select “File” as the transfer type.
3. Press the
Advanced Setup
button.
NOTE: Prescription maps must be in
.xml file formats.
Figure 203
Writing Job Data
4. Select a Task Controller Version as “Standard - Version 2”
(
Figure 204
).
5. Select ISO Compliant option as “Yes”.
6. Press the
Check
button to return to previous Job Data screen.
7. Press the
Browse
button to select the location to save the data on
computer hard drive.
1
2
3
7
8
Содержание INTELLIAG AI-120
Страница 1: ...INTELLIAG AI 120 ISO VIRTUAL TERMINAL Operator s Manual SINCE 1966...
Страница 7: ...OPERATOR S MANUAL AI 120 Virtual Terminal 11001 1606E 201703 Rev B VI...
Страница 9: ...OPERATOR S MANUAL AI 120 Virtual Terminal 11001 1606E 201703 Rev B 2 SAFETY NOTICES...
Страница 11: ...OPERATOR S MANUAL AI 120 Virtual Terminal 11001 1606E 201703 Rev B 4 INTRODUCTION...
Страница 15: ...OPERATOR S MANUAL AI 120 Virtual Terminal 11001 1606E 201703 Rev B 8 INSTALLATION...
Страница 21: ...OPERATOR S MANUAL AI 120 Virtual Terminal 11001 1606E 201703 Rev B 14 USING THE TERMINAL...
Страница 123: ...OPERATOR S MANUAL AI 120 Virtual Terminal 11001 1606E 201703 Rev B 116 MAIN OPERATOR SCREEN...
Страница 128: ...OPERATOR S MANUAL AI 120 Virtual Terminal 11001 1606E 201703 Rev B GUIDELINES 121 Figure 177 Complete Coverage Map...
Страница 131: ...OPERATOR S MANUAL AI 120 Virtual Terminal 11001 1606E 201703 Rev B 124 GUIDELINES...
Страница 159: ...OPERATOR S MANUAL AI 120 Virtual Terminal 11001 1606E 201703 Rev B 152 VARIABLE RATE JOB SETUP...
Страница 166: ...OPERATOR S MANUAL AI 120 Virtual Terminal 11001 1606E 201703 Rev B OPERATION 159...
Страница 173: ...OPERATOR S MANUAL AI 120 Virtual Terminal 11001 1606E 201703 Rev B 166 USING THE GUIDANCE SCREEN...
Страница 179: ...OPERATOR S MANUAL AI 120 Virtual Terminal 11001 1606E 201703 Rev B 172 AUTO STEERING CALIBRATION...