PPCH-G™ OPERATION AND MAINTENANCE MANUAL
© 2007 DH Instruments, a Fluke Company
Page 16
2.5
STORAGE AND SHIPPING
2.5.1
SHORT TERM STORAGE
The following procedure is recommended for short term storage of PPCH-G:
Vent the PPCH-G test pressure.
Turn the power OFF using the rear panel power switch.
Shut OFF or disconnect the high pressure gas supply to the
SUPPLY
port.
q
Shut OFF or disconnect the drive air pressure supply to the
DRIVE
port.
2.5.2
LONG TERM STORAGE
The following procedure is recommended for long term storage of PPCH-G:
Complete the short term storage procedure (see Section 2.5.1).
Plug the
TEST
port with a DH500 steel plug.
2.5.3
PREPARATION FOR SHIPPING
The following procedure is recommended to prepare PPCH-G for shipment:
Complete the long term storage procedure (see Section 2.5.2).
Pack PPCH-G carefully being sure to use packing materials appropriate for shipment of a
delicate instrument weighing approximately 50 kg (110 lb.). If available, use the original
packing materials.
Содержание PPCH-G
Страница 10: ...PPCH G OPERATION AND MAINTENANCE MANUAL 2007 DH Instruments a Fluke Company Page VIII N NO OT TE ES S...
Страница 96: ...PPCH G OPERATION AND MAINTENANCE MANUAL 2007 DH Instruments a Fluke Company Page 86 N NO OT TE ES S...
Страница 154: ...PPCH G OPERATION AND MAINTENANCE MANUAL 2007 DH Instruments a Fluke Company Page 144 N NO OT TE ES S...
Страница 158: ...PPCH G OPERATION AND MAINTENANCE MANUAL 2007 DH Instruments a Fluke Company Page 148 N NO OT TE ES S...