ElectroVap®
ELMC-SB
30
4
COMMISSIONING
Before operation, please check that your installation complies with the
manufacturer's technical recommendations. Check all power cables electrical
connections. Remove the blocking blue foam ring from the tank.
Marker 1: Validation & change menu button
Marker 2: Upward button
Marker 3: Downward button
Marker 4: Manual drain button for maintenance
Marker 5: LED = Steam production indication
•
Open the main water supply valve.
•
Switch on the main power supply (power and control voltages).
•
Switch on the unit switch.
•
If the unit asks you for a commissioning code, note the serial number on the
nameplate and contact your agent to obtain this code.
•
Enter your three-digit code by doing this:
Press one of the keys 1, 2, 3 and the display will show you 0XX, with the flashing zero to eventually change it by
pressing 2 or 3.
Once arrived at your digit, validate it by pressing key 1 and your second digit flashes. Repeat the previous two
operations to show the last two digits.
Very important: do not forget to validate the last digit.
•
Enter water quality in the displayed menu.
•
The device is ready to respond any production request.
•
During steam production, the LED (5) lights up.
5
1
2
3
4
Fig. 4
Steam generator display
Содержание ElectroVap ELMC 20-30 SB
Страница 1: ...STEAM GENERATOR FOR STEAM ROOM ElectroVap ELMC SB Series Instruction Operation Manual ...
Страница 25: ...ElectroVap ELMC SB 25 3 8 6 Wiring diagrams ELMC 5 to 10 Up V 1x200 240V 50 60Hz ...
Страница 26: ...ElectroVap ELMC SB 26 ELMC 5 to 30 Up V 3x200 690V 50 60Hz ...
Страница 27: ...ElectroVap ELMC SB 27 ELMC 40 to 60 Up V 3x200 690V 50 60Hz ...
Страница 28: ...ElectroVap ELMC SB 28 ELMC 90 Up V 3x200 690V 50 60Hz ...
Страница 29: ...ElectroVap ELMC SB 29 3 9 OPTION Transformer connection ...
Страница 51: ...ElectroVap ELMC SB 51 ...