PRO COMPACT & CAD D300 v2.4
Page 16
2) Starting-up the watermaker
Follow the procedure below:
Ø
Set switch to "Manual" and press START or press
on the Mini Remote
Control (which is optional, see procedure in paragraph 5).
Ø
The low pressure pump starts up, the needle on the low pressure gauge rises
to the green area.
Ø
Now turn the pressure regulating dial to the right (clockwise), until the needle
of the high pressure manometer reaches the orange zone. Continue to
gradually adjust until it reaches the beginning of the green zone
This pressure build-up procedure should last approximately 1 minute.
Make sure the pressure appears to be stable. The purpose of the above procedure is to
expel the air from the circuit and to have better pressure stability when the watermaker is
functioning.
➥
Note:
Setting the pressure to
t
oo high a level will force the watermaker stop and the
red light will come one. If this happens, decrease the pressure with the pressure
regulating dial and restart the start-up process above.
The fresh water yield depends on the temperature
of the sea water and the cleanliness
of the 5 & 25 micron filters (in the pre-filter).