![Denyo GAW-185ES2 Скачать руководство пользователя страница 39](http://html1.mh-extra.com/html/denyo/gaw-185es2/gaw-185es2_instruction-manual_2485073039.webp)
Periodic inspection and maintenance
GAW-185ES2
- 53 -
5-1 General inspection and maintenance prior to Operation
(1) Check for loose, missing, damaged bolt/nuts or other fasteners.
(2) Check for engine oil level and fill.
(3) Check for fuel or oil leakage.
5-2 Initial 20-hour inspection and maintenance
(1) Change of engine oil
Engine oil be replaced at an early period of either one month or after 20 hours after the start of
operations.
1) Remove the engine oil drain plug, and fully discharge the engine oil.
Smooth discharge is permitted, if the work is performed while the engine is still warm.
2) Feed fresh engine oil through the oil filler port, up to the “H” level (upper limit) marked on the
engine oil level gauge.
3) Run the engine for a while, assure that no oil leakage is observed, and then stop the engine.
Check the engine oil level about 10 minutes later. If the oil level is lower than the specified level,
replenish oil.
Oil filling
Do not thrust the dipstick
Oil drain
Use box wrench
(14mm)
Air Cleaner
Element
Cover
Battery
Fuel strainer
Mesh
Packin
Nut
Cup
Содержание GAW-185ES2
Страница 22: ...Periodic inspection and maintenance GAW 185ES2 36 Push Push...
Страница 45: ...Conveyance and installation GAW 185ES2 59 8 Servicing data 8 1 External dimensions and appearance drawing...
Страница 47: ...Conveyance and installation GAW 185ES2 61 8 3 Generator wiring diagram...
Страница 48: ...Conveyance and installation GAW 185ES2 62 8 4 Engine wiring diagram...