![Delta Electronics BX12.6AC100 Скачать руководство пользователя страница 32](http://html1.mh-extra.com/html/delta-electronics/bx12-6ac100/bx12-6ac100_operation-and-installation-manual_2477955032.webp)
PE
N (Grid)
L (Load)
PE
N
1
2
L
3.5.4 AC plug error check
Check the cable correction of AC plug by following instructions when error code:
AC phase abnormal (E08)
appear.
Step1.
Check the connection of each cable from AC panel.
Step2.
Check the foolproof brick on socket and AC plug is located correct.
Step3.
Check the continuity between N(Grid) and N(Load).
PE
N
1
2
L
AC plug side (print)
AC panel side
PE
N (Grid)
L (Load)
N (Load)
L (Grid)
N (Load)
L (Grid)
N (Load)
L (Grid)
Socket
AC plug
32
Installation
Содержание BX12.6AC100
Страница 1: ...Operation and Installation Manual Residential AC storage system BX6 3_AC100 www deltaww com...
Страница 2: ......
Страница 68: ...Version 220308...