About the System
27
4
Release latch
Press to release the sled from the enclosure.
5
Power-on indicator/
power button
The power-on indicator lights when the
sled power is on. The power-on indicator
lights amber when the system critical event
occurs.
NOTE:
The power-on indicator lights amber
according to critical system error log (SEL)
assertion. If the SEL is full or a deassertion
event occurred while sensor monitoring is
paused (e.g. fan monitoring is paused during
system power off), the power-on indicator
turns amber. To turn off an amber LED and
reset the power-on indicator to normal
condition (solid green), either perform a
BMC cold reset or reseat the sled in the
server enclosure.
The power button turns the compute
sled on.
NOTES:
• When powering on the sled, the video
monitor can take from several seconds
to over 2 minutes to display an image,
depending on the amount of memory
installed in the system.
• On ACPI-compliant operating systems,
turning off the sled using the power
button causes the sled to perform a
graceful shutdown before power to the
sled is turned off.
• To force an ungraceful shutdown, press
and hold the power button for five
seconds.
Item
Indicator, Button, or
Connector
Icon
Description
Содержание PowerEdge C8000
Страница 1: ...Dell PowerEdge C8000 Hardware Owner s Manual Regulatory Model B10S Regulatory Type B10S001 ...
Страница 41: ...About the System 41 Figure 1 24 Service Tag Location for C8000XD Storage Sled ...
Страница 160: ...160 Using the System Setup Program MIB Tree Diagram for FCB ...
Страница 170: ...170 Using the System Setup Program MIB Tree Diagram for PMC ...
Страница 185: ...Using the System Setup Program 185 ...
Страница 186: ...186 Using the System Setup Program ...
Страница 220: ...220 Installing System Components ...
Страница 250: ...250 Rack Mount Configuration ...
Страница 274: ...274 Troubleshooting ...
Страница 288: ...288 Jumpers and Connectors ...
Страница 290: ...290 Getting Help ...