Guidelines for installing and connecting AC power cables
Use the following figure as reference for connectors on the rear panel of the servers
and switches.
Figure 18 AC Connectors on rear panel of servers and switches
Management Server
1U1N
Data Switch
Management Switch
Port 1
Port 1
Port 1
Port 1
Port 2
Port 2
Port 2
Port 2
Install AC Power Cables
42
Hardware Installation Guide
Содержание EMC VxFlex Ready Node 14G
Страница 1: ...Dell EMC VxFlex Ready Node 14G Hardware Installation Guide 302 004 321 REV 03 ...
Страница 6: ...FIGURES 6 Hardware Installation Guide ...
Страница 8: ...TABLES 8 Hardware Installation Guide ...
Страница 16: ...Before You Begin 16 Hardware Installation Guide ...
Страница 18: ...1U1N Procedures 18 Hardware Installation Guide ...
Страница 40: ...1U1N Configuration Equipment Installation 40 Hardware Installation Guide ...
Страница 48: ...Install AC Power Cables 48 Hardware Installation Guide ...
Страница 62: ...2U1N Procedures 62 Hardware Installation Guide ...
Страница 74: ...2U1N Configuration Equipment Installation 74 Hardware Installation Guide ...