Figure 15 Installing the front bezel on 1U system
Figure 16 Installing the front bezel on 2U system'
Connect and route cords and cables
Procedure
1. Connect the power cords and I/O cables as described in documentation for
your system.
2. If the system uses a cable management arm (CMA), install it as described in the
document shipped with the CMA.
1U1N Configuration Equipment Installation
38
Hardware Installation Guide
Содержание EMC VxFlex Ready Node 14G
Страница 1: ...Dell EMC VxFlex Ready Node 14G Hardware Installation Guide 302 004 321 REV 03 ...
Страница 6: ...FIGURES 6 Hardware Installation Guide ...
Страница 8: ...TABLES 8 Hardware Installation Guide ...
Страница 16: ...Before You Begin 16 Hardware Installation Guide ...
Страница 18: ...1U1N Procedures 18 Hardware Installation Guide ...
Страница 40: ...1U1N Configuration Equipment Installation 40 Hardware Installation Guide ...
Страница 48: ...Install AC Power Cables 48 Hardware Installation Guide ...
Страница 62: ...2U1N Procedures 62 Hardware Installation Guide ...
Страница 74: ...2U1N Configuration Equipment Installation 74 Hardware Installation Guide ...