3. Rotate the system downward until all the rail standoffs are seated in the J-slots.
Figure 13 Install the system in the rails
4. Push the system inward until the lock levers click into place.
5. Pull the blue slide release lock tabs forward on both rails and slide the system
into the cabinet. The slam latches will engage to secure the system in the
cabinet.
Note
Ensure that the inner rail slides completely into the middle rail. The middle rail
locks if the inner rail is not fully engaged.
1U1N Configuration Equipment Installation
36
Hardware Installation Guide
Содержание EMC VxFlex Ready Node 14G
Страница 1: ...Dell EMC VxFlex Ready Node 14G Hardware Installation Guide 302 004 321 REV 03 ...
Страница 6: ...FIGURES 6 Hardware Installation Guide ...
Страница 8: ...TABLES 8 Hardware Installation Guide ...
Страница 16: ...Before You Begin 16 Hardware Installation Guide ...
Страница 18: ...1U1N Procedures 18 Hardware Installation Guide ...
Страница 40: ...1U1N Configuration Equipment Installation 40 Hardware Installation Guide ...
Страница 48: ...Install AC Power Cables 48 Hardware Installation Guide ...
Страница 62: ...2U1N Procedures 62 Hardware Installation Guide ...
Страница 74: ...2U1N Configuration Equipment Installation 74 Hardware Installation Guide ...