Steps
Slide the new power supply unit into the chassis until the power supply unit is fully seated and the
release latch snaps into place.
NOTE: If you unlatched the cable management arm, re-latch it. For information about the cable
management arm, see the system’s rack documentation.
Next steps
1.
Connect the power cable to the power supply unit and plug the cable into a power outlet.
CAUTION: When connecting the power cable, secure the cable with the strap.
NOTE: When installing, hot-swapping, or hot-adding a new power supply unit, wait for 15
seconds for the system to recognize the power supply unit and determine its status. The power
supply redundancy may not occur until discovery is complete. Wait until the new power supply
unit is discovered and enabled before you remove the other power supply unit. The power-
supply unit status indicator turns green to signify that the power supply unit is functioning
properly.
Related Links
Removing the power supply unit blank
Removing a redundant AC power supply
Removing the power supply unit blank
If you are installing a second power supply unit, remove the power supply unit blank in the bay by
pulling the blank outward.
CAUTION: To ensure proper system cooling, the power supply blank must be installed in the
second power supply bay in a non-redundant configuration. Remove the power supply blank
only if you are installing a second power supply.
121
Содержание E30S001
Страница 1: ...Dell PowerEdge T430 Owner s Manual Regulatory Model E30S Series Regulatory Type E30S001 ...
Страница 26: ...26 ...
Страница 29: ...4 Download the drivers you require to a diskette drive USB drive CD or DVD 29 ...
Страница 179: ...179 ...