Site preparations
The N2200-ON Series switch is suitable for installation as part of a common bond network (CBN).
You can install the switch in:
•
Network telecommunication facilities
•
Data centers
•
Other locations where the National Electric Code (NEC) applies
NOTE:
Install the switch into a rack or cabinet before installing any additional components such as cables or optics.
Topics:
•
•
•
•
•
•
•
Site selection
Install the switch equipment in restricted access areas.
A restricted access area is one in which service personnel can only gain access using a special tool, lock, key or other means of security.
The authority responsible for the location controls access to the restricted area.
Ensure that the area where you install your switch meets the following safety requirements:
•
Near an adequate power source. Connect the switch to the appropriate branch circuit protection according to your local electrical
codes.
•
Switch environmental temperature range is from 0° to 45°C (32° to 113°F).
•
Relative humidity is from 5 to 95 percent (RH), noncondensing.
•
In a dry, clean, well-ventilated, and temperature-controlled room, away from heat sources such as hot air vents or direct sunlight
•
Away from sources of severe electromagnetic noise.
•
Inside the restricted access area, positioned in a rack or cabinet, or on a desktop with adequate space in the front, back, and sides for
proper ventilation and access
•
Install the switch in Information Technology Rooms in accordance with Article 645 of the National Electrical Code and NFPA 75.
For more information about switch storage and environmental temperatures, see
.
Cabinet placement
Install the N2200-ON Series switch only in indoor cabinets that are designed for use in a controlled environment.
Do not install the switch in outside cabinets. For cabinet placement requirements, see
.
The cabinet must meet minimum size requirements. Airflow must be in accordance with the Electronic Industries Alliance (EIA) standard.
Ensure that there is a minimum of 5 inches (12.7 cm) between the intake and exhaust vents and the cabinet wall.
Rack mounting
When you prepare your equipment rack, ensure that the rack is grounded.
Ground the equipment rack to the same ground point the power service in your area uses. The ground path must be permanent.
3
Site preparations
17
Содержание PowerSwitch N2200-ON Series
Страница 1: ...Dell EMC PowerSwitch N2200 ON Series Installation Guide...
Страница 16: ...1 Product ID QRL 2 Product information QRL 3 SVC tag 4 MAC address 5 Exp Svc code 16 N2200 ON Series switch...
Страница 44: ...1 Fan N2224X ON fan installation 1 Fan N2248PX ON fan installation 1 Fan N2248X ON fan installation 44 Fans...