Page 14
How to Check / Clean the Heat Exchange Coil:
(NOTE: See the Operators Safety Manual
The heat exchange coil should be inspected for deposit build-up after 40 hours of use, or once a month, whichever
comes first. In hard water areas a water softening system should be employed.
Scaling or liming of the coils is caused by mineral deposits from the water and occurs much faster in hard- water
areas and with heavier machine usage. Lime build-up can also be caused by inferior cleaning compounds.
DANGER: Failure to properly maintain the heat exchange coil can result in a steam explosion! Scale or lime build-
up will act as an insulation and decrease the efficiency of the heatexchanger coil and will also cause
"hot spots". This can result in a weakening of the tubing which can lead to a steam explosion.
Содержание Avenger 1000-3 LP
Страница 19: ...Page 19 Delco Avengers 1000 3 NG LP Single Phase Assembly Drawing No 1 Machine Layout...
Страница 20: ...Page 20 Delco Avengers 1000 3 NG LP Single Phase Assembly Drawing No 2...
Страница 22: ...Page 22 Delco Avengers 1000 3 NG LP Single Phase Assembly Drawing No 3...
Страница 24: ...Delco Avengers 1000 3 NG LP Single Phase Assembly Drawing No 4...
Страница 26: ...DELCO Avenger 1000 3 NG LP Single Phase Pump Drawing...
Страница 28: ...DELCO Avengers 1000 3 NG LP Single Phase Electrical Schematic...
Страница 30: ...1111 E Lake Francis Dr Siloam Springs AR 72761 1 800 BUY DELCO...