Page 17
HOW TO CORRECT PROBLEMS IN THE MACHINE
Problem
Cause
Action
Pilot light will not remain burning.
Insufficient pilot pressure.
Adjust per instructions in gas valve section.
Cross drafts.
Machine must have draft divertor installed.
Close all out-side doors which may allow
windy conditions to blow the pilot out.
No spark and no pilot gas.
No main Power.
Check breakers or fuses.
Faulty transformer.
Contact an authorized Delco service person.
Faulty vac switch.
Contact an authorized Delco service person.
Faulty limit switch, high limit switch.
Contact an authorized Delco service person.
Faulty ignition control unit.
Contact an authorized Delco service person.
Spark but no pilot gas
No gas supplied to pilot valve.
Check manual pilot in line valve.
Manual valve(s) in the "Off" position.
Check knob position and gas shut off.
Restricted pilot line or plugged pilot orifice.
Contact an authorized Delco service
person.
Faulty pilot valve.
Contact an authorized Delco service
person.
Faulty wiring.
Contact an authorized Delco service
person.
Faulty ignition control.
Contact an authorized Delco service
person.
Pilot gas but no spark.
Broken or shorted electrode assembly.
Contact an authorized Delco service
person.
Faulty ignition control unit.
Contact an authorized Delco service
person.
Pilot flame is lit but main
Low pilot flame.
Check manual pilot valve.
burner does not come on.
Improper alignment of sensor in pilot flame
Contact an authorized Delco service person.
Faulty main gas operator in gas control.
Contact an authorized Delco service person.
Faulty wiring
Contact an authorized Delco service person.
Faulty flame sensor.
Contact an authorized Delco service person.
Faulty ignition control unit.
Contact an authorized Delco service person.
Pilot cycles on and off by itself.
Faulty pilot valve.
Contact an authorized Delco service person.
Faulty wiring.
Contact an authorized Delco service person.
Содержание Avenger 1000-3 LP
Страница 19: ...Page 19 Delco Avengers 1000 3 NG LP Single Phase Assembly Drawing No 1 Machine Layout...
Страница 20: ...Page 20 Delco Avengers 1000 3 NG LP Single Phase Assembly Drawing No 2...
Страница 22: ...Page 22 Delco Avengers 1000 3 NG LP Single Phase Assembly Drawing No 3...
Страница 24: ...Delco Avengers 1000 3 NG LP Single Phase Assembly Drawing No 4...
Страница 26: ...DELCO Avenger 1000 3 NG LP Single Phase Pump Drawing...
Страница 28: ...DELCO Avengers 1000 3 NG LP Single Phase Electrical Schematic...
Страница 30: ...1111 E Lake Francis Dr Siloam Springs AR 72761 1 800 BUY DELCO...