Page 9
Stacking the Unit:
If the cleaner is used in an enclosed area be sure there is plenty of ventilation.. Be sure the chimney is the same size
as the stack on the cleaner. Poor draft will cause the unit to soot and not operate efficiently. When placing the unit
for installation, keep in mind that the unit should be positioned in such a manner that the stack will be as straight as
possible and protrude through the roof of the building at a proper location and at sufficient height to eliminate
downdraft.
A gas fired unit should have a draft divertor and proper rain protection on the vent pipe.
DANGER: All gas burner equipped cleaners should be installed and serviced in accordance with the
requirements of your local gas company and all applicable state laws or local ordinances.
Water Supply:
1. Connect the machine to the water supply with 3/4" water hose and 3/4" connections.
2. Insure that the water supply is capable of suppyling sufficient water flow volume.
CAUTION: Insufficient water flow can cause pump damage and failure.
Gas Supply:
1. Insure that the gas cock knob is in the "Off" position.
2. Installation of gas service to this machine is to be made with 1" plumbing or larger. Refer to chart on page 4.
Electrical:
CAUTION: This machine must be electrically grounded.
1. Connect only to grounded outlets with 30 ampere, 230 volt a/c (alternating current), 60 Hz, single phase circuits
protected by fuses or circuit breakers and GFCI protection.
Installation Checkout:
Before Starting:
1. Connect discharge hose and gun. Remove pressure nozzle.
2. Connect the water supply hose to the water inlet. Turn the water on and allow the water float tank to fill. When
the tank has filled and the flow through the float valve has stopped, check to insure that there is at least 1" be-
tween the water level and the float valve opening.
3. Before connecting the power supply be sure that the control switch is in the "Off" position.
WARNING: For your safety, if you smell gas:
1. Open windows.
2. Do not touch electrical switches.
3. Extinguish any open flame.
4. Immediately evacuate premises and call your gas supplier.
Pilot Lighting Procedure:
1. Turn the control switch to the #2 burner position.
2. When the trigger is pulled and water starts being pulled into the pump, the vac switch closes. In a couple
of seconds the pilot valve opens and simultaneously the spark starts. This operation will continue for 15
seconds or until the pilot ignites. If the pilot fails to light in 15 seconds the ignition systems "locks out"
and the power must be turned off to reset the ignition system.
Содержание Avenger 1000-3 LP
Страница 19: ...Page 19 Delco Avengers 1000 3 NG LP Single Phase Assembly Drawing No 1 Machine Layout...
Страница 20: ...Page 20 Delco Avengers 1000 3 NG LP Single Phase Assembly Drawing No 2...
Страница 22: ...Page 22 Delco Avengers 1000 3 NG LP Single Phase Assembly Drawing No 3...
Страница 24: ...Delco Avengers 1000 3 NG LP Single Phase Assembly Drawing No 4...
Страница 26: ...DELCO Avenger 1000 3 NG LP Single Phase Pump Drawing...
Страница 28: ...DELCO Avengers 1000 3 NG LP Single Phase Electrical Schematic...
Страница 30: ...1111 E Lake Francis Dr Siloam Springs AR 72761 1 800 BUY DELCO...