![Delachaux Conductix-Wampfler 0314 Series Скачать руководство пользователя страница 46](http://html1.mh-extra.com/html/delachaux/conductix-wampfler-0314-series/conductix-wampfler-0314-series_installation-manual_2465764046.webp)
Installation Manual
Festoon Systems for I-Beams
Program 0314
MAL0300-0001-EN
www.conductix.com
translated document
page 46 of 56
Service measures
Interval
Components
Measure
Description
Ev
ery
14 days
: 3 and 4
-s
hi
ft op
eration
at the lates
t after 300 oper
ational hours
Ev
ery
30 days
: 2
-s
hi
ft op
eratio
n
at the lates
t after 300 oper
ational hours
Roller mounting
Mai
nten
ance me
asur
e
Tighten all fasteners.
Cable attachment
Tighten all fasteners on clamping bars and cable clamps.
Annually
(depe
nds on exte
rnal
in
flu
ences
)
Surface/ corrosion protection
Corrosion coating
repair /
replace
Refinish hot-dip galvanized surfaces with zinc coating.
Refinish lacquered surfaces.
8.2.5
Wearing parts
Wearing parts are excluded from the warranty. This includes:
-
All trolley rollers including main rollers, horizontal guide rollers, counter-pressure rollers
-
Other definitions require written documentation.