![Delachaux Conductix-Wampfler 0314 Series Скачать руководство пользователя страница 43](http://html1.mh-extra.com/html/delachaux/conductix-wampfler-0314-series/conductix-wampfler-0314-series_installation-manual_2465764043.webp)
Installation Manual
Festoon Systems for I-Beams
Program 0314
MAL0300-0001-EN
www.conductix.com
translated document
page 43 of 56
8.2.1
Inspection with the system at a standstill
CAUTION!
-
Protect the festoon system from inadvertent activation.
-
Any safety devices that have been removed during inspection of the system when at a standstill
must be refitted immediately on completion of the work and tested.
-
Check measuring tools used after clean up/ collection and inventory.
Inspection measures
Interval
Components
Measure Description
Ev
ery
14 days
: 3 and 4
-s
hi
ft
op
er
at
io
n
at the lates
t after 300 oper
ational hours
Ev
ery
30 days
: 2
-s
hi
ft op
eratio
n
at the lates
t after 300 oper
ational hours
Rollers
Vi
sual
in
spection
-
for good condition
-
for proper functioning
-
for proper movement
-
for tight attachment
-
for deformation
-
for wear
-
for damage
-
for degree of contamination
-
for corrosion
Cable saddles
Fasteners
Cables
Fixed cabling
Connections with the installation
Track beam