Installation Manual
Festoon Systems for I-Beams
Program 0314
MAL0300-0001-EN
www.conductix.com
translated document
page 16 of 56
3.4
Track beam
The operator is basically responsible for ensuring that the track carrier is securely fastened as well as checking it for wear,
corrosion or defects.
The following procedures are to be observed when installing the track beam:
In general, track beams are to be protected from corrosion using appropriate measures.
The running surfaces of the main rollers and the horizontal guide rollers must be clean and free of objects or defects that could
damage the rollers (scratches, cracks, holes, uneven segments, etc.).
If multiple beams are welded together, they must all have the same measurements, shape and positional tolerances.
The beam flanges are to be aligned with particular care in horizontal and vertical planes.
Track beams that have been damaged during transport or rolling are not permitted for use.
Modified areas (from welding, sanding, etc.) on the track beam are to be protected from corrosion with appropriate measures.
There may be no projecting contours on the sides of the track area or under the track beam.