11
30SD, 36SD, 45SD
Rev. Nov2014
Step 4: Chute Direction Control Cable Support
With the rubber lined strap removed, put the chute
direction control cable and the chute deflector
cable into the opening, and press the strap
together aligning the hole for the bolt.
Secure strap to side of the engine.
NOTE: Rotate discharge chute and ensure there is
no binding of any cables and there is enough slack
in the deflector cable for full rotation.
Need Help With Assembly?
(919)-550-3259
Step 5: Drift Cutters (if desired)
1. The drift cutters are attached to the main housing in
the stored position.
2. Remove the two bolts on each drift cutter.
3. Reattach
the
drift cutters in the operating position.
4. Replace bolts and secure tightly.
Step 6: Skid Shoes
1. Skid shoes are stored in the hardware bag for shipping.
2. Remove from hardware bag, and install skid shoes using the provided
fasteners
3.
Insert the fasteners so the flat head of the carriage bolt is toward the
inside of the main housing.
CAUTION: Check the skids to ensure that the auger does not
contact the paved or gravel surface. Adjust skids as necessary to
make up for wear on the snow blower.
Position skid shoes so that the scraper blade is elevated at least
1/4” from the ground. This allows easier maneuvering and
prevents drag on the snow blower when encountering unseen
imperfections on the surface to be cleaned.
1. Check the tire pressure to ensure the tires are properly inflated.
2. Move skid shoes up and down to the desired position based on the
surface texture.
If the surface is rougher adjust the skid shoes lower which increases
the auger ground clearance.
If the surfaces is smoother adjust the skid shoes higher (decrease
ground clearance). Firmly tighten the nuts that secure both skids to
the auger sides.