De Gier B.V., Westlandseweg 9, 2291 PG WATERINGEN, THE NETHERLANDS,
Tel. +31 (0)174 292089, Email: [email protected], www.degierdrivesystems.com
Versie 1 – 2020 / 03 / 01
11
Installation of the motor gearbox may only be carried out by qualified staff, see section 1.
Installation positions
Maintain a clearance of approximately 500 mm above the protective cover for adjusting the limit switch. There are no
further limitations in mounting positions of the KL300.
Mounting the motor gearbox
Secure the gearbox with four bolts and apply a torque of 40 Nm to 50 Nm to tighten the bolts. Use M10 bolts with a
strength class of 8.8 according to ISO 4014, threaded length in the gearbox of 10 to 15 mm.
If wood screws or wall anchors are used for mounting, the right screws and tightening torques must be determined by
the installer. These mounting materials must provide the same clamping force as the M10 bolts with a strength class of
8.8 according to ISO 4014, tightened at 40 Nm to 50 Nm of torque.
4. Installation and mounting instructions
Warning
Please ensure that the building structure can sufficiently absorb the forces applied by the KL300.