Set-Up & Installation
Product Reference Guide
2-35
4. Disconnect the Load Cell harness.
5. Move the Load Cell/Spider Assembly into position on the opposite
side of the scanner cavity and re-install the original screws. Torque
the screws evenly to 50 in-lb.
Figure 2-19. Locating the EAS Single-Antenna (Left-to-Right)
6. Route the Load Cell harness, re-bending it as indicated on the har-
ness, and reconnect.
7. Orient the EAS Antenna in the position indicated by
Figure 2-17
,
then route the antenna cable down through the unit’s side. Securely
attach the antenna using the screws provided.
8. Connect the antenna cable to the EAS Controller Box.
9. Re-install the platter.
This completes the EAS Single-Antenna location swapping procedure.
EAS Antenna
Product Flow
Product Flow
Load Cell/Spider
Assembly
Load Cell Harness
(bend for left-hand
scale installation)
The scale must be recalibrated upon completion of this proce-
dure, or upon completion of installation.
WARNING
DO NOT touch EAS Antenna coils inside of housing when in operation. Coils
generate over 500 VDC when activated.
LEGAL NOTE
Содержание Magellan 9500?
Страница 1: ...Magellan 9500 9500 9504 9504 with SmartSentry Product Reference Guide...
Страница 28: ...1 16 Magellan 9500 NOTES...
Страница 86: ...3 16 Magellan 9500 Figure 3 5 Removing Replacing the WRG Window Slide WRG Window Out Remove Vertical Bezel...
Страница 100: ...4 14 Magellan 9500 NOTES...
Страница 116: ...5 16 Magellan 9500 NOTES...
Страница 396: ...6 280 Magellan 9500 NOTES...
Страница 416: ...B 10 Magellan 9500 NOTES...
Страница 426: ...D 2 Magellan 9500 NOTES...
Страница 442: ...E 16 Magellan 9500 NOTES...
Страница 458: ...F 16 Magellan 9500 NOTES...