G e t t i n g S t a r t e d
DataDirect Networks EF2800 FC RAID Storage System User Guide (V 1.0)
25
3.
Slide the module into the enclosure until the latches engage
automatically. The modules should be installed in rear bays 3 and
4 of the enclosure
(Figure 24)
. Note that the LH and RH modules
are installed in opposite orientations.
4.
Cam the module home by manually closing the latches
(Figure 25)
.
A click should be heard as the latches fully engage.
Storage Manager B
Storage Manager A
Figure 24. Module Locations
Figure 25. Installing a Controller I/O Module
Содержание EF2800
Страница 1: ...EF2800 Fibre Channel RAID System User Guide ...
Страница 2: ...V 1 0 EF2800 Fibre Channel RAID Storage System User Guide DataDirect Networks ...
Страница 5: ...iv This page intentionally left blank ...
Страница 13: ...This page intentionally left blank xii ...
Страница 37: ...This page intentionally left blank 14 ...
Страница 65: ...This page intentionally left blank 42 ...
Страница 79: ...This page intentionally left blank 56 ...
Страница 201: ...This page intentionally left blank 178 ...
Страница 215: ...This page intentionally left blank 192 ...
Страница 227: ...This page intentionally left blank 204 ...
Страница 305: ...This page intentionally left blank 282 ...
Страница 343: ...This page intentionally left blank 320 ...
Страница 363: ...This page intentionally left blank 340 ...