226
DataDirect Networks EF2800 FC RAID Storage System User Guide (V 1.0)
C r e a t i n g a n d M a n a g i n g A r r a y s & P a r t i t i o n s
4.
Select
Start Verify
and press <Enter>. Verification begins and the
percentage of verification completed displays
(Figure 109)
. You can
continue to use the array during verification.
To return to the verification menu, press <Esc>. To check the progress
of the array verification, you can use the verification status described
below or select
Array Menu
from the System Menu. The status of the
verification displays in the list of arrays.
D.2.4.1
Viewing Verification Status
You can view the status of the verification process while it is running.
To view verification status:
1.
From the System Menu, select
Array Menu
and press <Enter>.
The Select Array screen displays with a list of existing arrays.
2.
Select the array you want and press <Enter>. The array menu
displays.
3.
Select
Verify Function
and press <Enter>.
The verify menu
displays.
Figure 108. Verify LUN Screen
Figure 109. Verify Progress Screen
Содержание EF2800
Страница 1: ...EF2800 Fibre Channel RAID System User Guide ...
Страница 2: ...V 1 0 EF2800 Fibre Channel RAID Storage System User Guide DataDirect Networks ...
Страница 5: ...iv This page intentionally left blank ...
Страница 13: ...This page intentionally left blank xii ...
Страница 37: ...This page intentionally left blank 14 ...
Страница 65: ...This page intentionally left blank 42 ...
Страница 79: ...This page intentionally left blank 56 ...
Страница 201: ...This page intentionally left blank 178 ...
Страница 215: ...This page intentionally left blank 192 ...
Страница 227: ...This page intentionally left blank 204 ...
Страница 305: ...This page intentionally left blank 282 ...
Страница 343: ...This page intentionally left blank 320 ...
Страница 363: ...This page intentionally left blank 340 ...