G e t t i n g S t a r t e d
DataDirect Networks EF2800 FC RAID Storage System User Guide (V 1.0)
21
information on how to disengage the lock. Dummy modules may
be left in the slots.
3.
Carefully place the chassis on the two rail/support assemblies and
push it all the way into the rack.
If in doubt about correct orientation, the drive bays (at front)
should have their black drive connectors toward the bottom of
each bay.
4.
Secure the front of the chassis to the rack frame by inserting four
#10 screws (two on each side) through the holes in the flanges and
into the rack frame.
Using four #10 screws (two on each side), secure rear of chassis
to rail/support assemblies
(Figure 17)
.
5.
Replace the two power supplies in the back.
Insert one module into the left most bay and the other module into
the right most bay. Note the orientation of the modules
(Figure 19)
.
Swing the handle towards the module to cam the module home.
Make sure that the latches are engaged.
Figure 19. Power Supply Locations in Rear Panel
Содержание EF2800
Страница 1: ...EF2800 Fibre Channel RAID System User Guide ...
Страница 2: ...V 1 0 EF2800 Fibre Channel RAID Storage System User Guide DataDirect Networks ...
Страница 5: ...iv This page intentionally left blank ...
Страница 13: ...This page intentionally left blank xii ...
Страница 37: ...This page intentionally left blank 14 ...
Страница 65: ...This page intentionally left blank 42 ...
Страница 79: ...This page intentionally left blank 56 ...
Страница 201: ...This page intentionally left blank 178 ...
Страница 215: ...This page intentionally left blank 192 ...
Страница 227: ...This page intentionally left blank 204 ...
Страница 305: ...This page intentionally left blank 282 ...
Страница 343: ...This page intentionally left blank 320 ...
Страница 363: ...This page intentionally left blank 340 ...