DAS Energy 6x1M RJB Скачать руководство пользователя страница 15

The installation method of direct bonding of DAS En-
ergy PV modules on a roofing membrane implies that 
the cabling cannot be done behind the modules. Thus, 
it is required to use cable trays in order to avoid direct 
sun light exposure and water immersion.  

The cable trays should be installed with a spacer (con-
crete slabs, protective mats or similar) between the 
roof and the cable tray (see Fig. 10) and, if possible, in 
water  flow  direction,  so  that  the  rainwater  can  drain 

unhin dered and no pressure load occurs at the cable 
trays due to rainwater or snow. Hereby a minimum 
distance of 10 mm and/or the local requirements, re-
spectively, must be observed. In any case the installer 
should ensure compliance with the appropriate stan-
dards. Local legislation and local applicable wind and 
snow load tables must be observed, and appropriate 
measures must be taken to ensure the resistance of 
the cable trays against wind and snow load as well as 
ice pressure. 

The DAS Energy modules correspond to safety class II 
in accordance with IEC 61140 “Protection against elec-
tric shock” and safety application class A in accordance 
with IEC 61730 “Photovoltaic (PV) module safety qual-

ification”  and  do  not  require  any  grounding.  The  DAS 
Energy photovoltaic modules exceed the normative 
insulation requirements of 40 MΩ m² significantly and 
do not have any conducting frame.

The DAS Energy modules correspond to safety class II and do not have any accessible conductive parts or frames 
and do not need to be grounded.

The DAS Energy modules do not suffer from PID due 
to the unique material composition; therefore, it is not 
necessary to functionally ground the negative genera-
tor pole. Nevertheless, negative generator pole ground-
ing is possible with DAS Energy modules. In this case, 

only use inverters which include licensed grounding kits 
and follow the directions of the inverter manufacturer 
(make sure that the difference of potential between the 
nega tive generator connection and the PE(N) of every 
MPP tracker of the respective inverter is zero volt).

The DAS Energy modules do not have any accessible 
conductive parts or frames and hence cannot be incor-
porated into the possibly available lightning protection. 
Nevertheless, it is necessary to observe the required 
separation distances to a possibly available lightning 
protection. We recommend to involve a corresponding 

special consultant. Please also observe – possibly de-
pending on the lightning protection concept – the cur-
rent standards and directives for overvoltage protection 
on the DC-side of the solar generator and inverter as 
well as on the AC-side (grid connection) of the inverter.

CABLE TRAYS

EARTHING / LIGHTNING PROTECTION

Fig. 10: 

Example of a cable tray, which is 

distanced from the roof

PROTECTIVE GROUNDING

FUNCTIONAL GROUNDING / POTENTIAL INDUCED DEGRADATION (PID)

ANTI-LIGHTNING PROTECTION

The cable trays must not be left open. 

13

Electrical installation

Содержание 6x1M RJB

Страница 1: ...INSTALLATION MANUAL DAS Energy Modules...

Страница 2: ...ON AND MAINTENANCE VISUAL INSPECTION CLEANING MODULE REPLACEMENT DISMANTLING VII DISPOSAL VIII POTENTIAL SOURCES OF FAULTS IX TECHNICAL DETAILS PRODUCT MARKING PRODUCT LABEL SAFETY APPLICATION CLASS F...

Страница 3: ...lls and the position of the junction box PRODUCT TYPE DESIGNATION AND APPLICABLE PRODUCTS This installation manual is applicable to the PV module types as listed below 6x1M RJB 6x1M FJB 6x2M RJB 6x2M...

Страница 4: ...ty from the employer s liability insur ance associations Assembly installation and initial operation of the modules requires expert knowledge and must only be car ried out by qualified and authorized...

Страница 5: ...and dry room until installation The packaging is not weath er proof Do NOT attempt to repair a damaged module Do NOT concentrate sunlight e g mirrors or lenses or other sources of artificial light on...

Страница 6: ...ways be pro tected from pollution e g dust humidity foreign particles etc prior to installa tion the modules are supplied with protective dust caps on the PV4 S connectors Do not leave unconnected unp...

Страница 7: ...um per missible loads The modules should be installed in such a way that there is no shading throughout the year It must be en sured that there is no obstacle or other roof structure which can cause p...

Страница 8: ...ig 2 show a typical module layout In order to compensate for the thermal linear expansion of the modules and the substrate an inter module distance of at least 30 mm must be maintained A larger dis ta...

Страница 9: ...in landscape or por trait orientation In any case the adhesive beads must be applied in water flow direction Identify and if possi ble leave out recurring sources of dirt and avoid shad ing sources In...

Страница 10: ...at Standard Test Conditions 1 000 W m 25 2 C AM 1 5 Under normal conditions a photo voltaic module is likely to experience conditions that produce more current and or voltage than reported at STC Sta...

Страница 11: ...bending radius R 5 x Cable diameter must be maintained see Fig 5 Despite the cables are sun light resist ant and waterproof protection class IP 68 where possible place the cables in cable ducts in or...

Страница 12: ...cal connection Plugs and junction boxes must not get into contact with the Multisol Project cleaning agent Do not attempt to make an electrical connection with wet soiled or otherwise faulty connector...

Страница 13: ...y must always be consulted in advance Only after verification and confirmation from DAS Energy the replacement of the damaged MC4 Evo 2 connectors is permitted In case the MC4 Evo2 connector should be...

Страница 14: ...locked and engaged When the connectors are correctly connected the latches of the positive connector should be flush with the latches of the negative connector see Fig 8 Please use the corresponding...

Страница 15: ...The DAS Energy modules correspond to safety class II and do not have any accessible conductive parts or frames and do not need to be grounded The DAS Energy modules do not suffer from PID due to the...

Страница 16: ...eplacement may be necessary The dismantling of DAS Energy modules is possible at both screw fastened mounting and bonded mounting Avoid cleaning the modules on hot sunny days in the middle of the day...

Страница 17: ...cutting wire between the module and the substrate lengthwise through the adhesive beads as shown in Fig 11 Take care here not the damage adjoining modules After wards the module can be detached from t...

Страница 18: ...ndered Shading orientation Avoid shading sources cable trays Remove concentrated dirt accumulations from the module surface Linear expansion Distance of 30 mm plastic and bitumen roof sheeting between...

Страница 19: ...mechanical mounting instructions refer to IV Module installation Please find below the datasheet of the module types to which this manual is applicable The module types are subject to changes without...

Страница 20: ...eet EXTREME WEATHER CONDITIONS Even in heat sandstorms and dusty conditions the module provides stable and durable performance COMPOSITE SUPERLIGHT MODULE 11x6 TECHNICAL DATA Solar cells 5BB monocryst...

Страница 21: ...oc 7 91 Vmp 7 x 3 M 105 Wp 14 38 Voc 11 87 Vmp 7 x 4 M 140 Wp 19 17 Voc 15 82 Vmp 7 x 5 M 175 Wp 23 96 Voc 19 78 Vmp 7 x 6 M 210 Wp 28 76 Voc 23 73 Vmp 1113 mm 6 6 x 1 M 30 Wp 4 11 Voc 3 39 Vmp 6 x 2...

Страница 22: ...d ausschlie lich informativ und ersetzen keine eigene Haftungspr fung 6 FREIGABETABELLE Gestestete und freigegebene Untergr nde Release Type date Clean with Kunststoff EPDM Firestone RubberGard 02 201...

Страница 23: ...21 Declaration of Conformity...

Страница 24: ...ww das energy com download datasheets Branch Austria 05 2023 EN DAS Energy Ltd The General Warranty and Terms and Conditions of DAS Energy Ltd apply Subject to typographical and printing errors as wel...

Отзывы: