6
Assembly,
continued
Assembling the unit Follow the procedure below to assemble the unit:
Step
Action
1
Install the mounting rail horizontally
on the wall with four screws which are
appropriate to the material and thick-
ness of the wall and mount the rubber
strap on the rail as shown.
The screws must have a breaking
strength of at least 365 N.
NOTE: Please note that Dantherm Air
Handling is able to provide spe-
cial fixtures to reduce the depth
of the unit if the HCV 4 needs to
be built into a cabinet with a
door.
2
Mount the two spacers on the back of
the unit as shown.
3
Lift the unit onto the mounting rail.
Due to the weight of the unit, two
people are required to lift it into place.
4
Connect the discharge pipe to the pipe
connection. Use lubrication if re-
quired.
Continued overleaf
Содержание HCV 5
Страница 1: ...HCV 4 HCV 5 Installation manual Rev 1 1 EN DA DE FR ...
Страница 19: ...17 070719 Version 1 1 05 10 2012 EN Spare parts list HCV 4 Illustration Spare parts list illustration HCV 4 ...
Страница 32: ...30 Dimensions HCV 5v12 Unit dimensions The illustration shows the dimensions on an HCV 5v12 ...
Страница 64: ...30 Dimensioner HCV 5v12 Aggregatets dimen sioner Illustrationen viser dimensionerne på en HCV 5v12 ...
Страница 83: ...17 070719 Version 1 1 05 10 2012 DA DE Ersatzteilliste HCV 4 Abbildung Abbildung über Ersatzteile HCV 4 ...
Страница 96: ...30 Abmessungen HCV 5v12 Abmessungen des Geräts Die Abbildung zeigt die Abmessungen eines HCV 5v12 ...
Страница 116: ...18 Liste des pièces de rechange HCV 4 Illustration Illustration de la liste des pièces de rechange HCV 4 ...
Страница 130: ...32 Dimensions HCV 4 Dimensions de l appareil L illustration indique les dimensions du modèle HCV 4 ...
Страница 132: ...34 Schéma électrique Schéma Il s agit du schéma électrique des modèles HCV 4 HCV 5v12 ...
Страница 134: ...36 ...
Страница 136: ...2 Dantherm Air Handling A S Marienlystvej 65 7800 Skive Denmark www dantherm com service dantherm com 070719 070719 ...