31
Installation, operation and maintenance instructions - VMGFE102
17 STARTUP CHECKLIST FOR AR05 HEAT PUMPS USE FOR JOB FILE
Preliminary information
Job name: ........................................................................................................................................................................................................................................
Location: ..........................................................................................................................................................................................................................................
Installing contractor: ...................................................................................................................................................................................................................
Distributor: ......................................................................................................................................................................................................................................
Start-up preformed by: ............................................................................ Date: ...................................................................................................................
Equipment
Model AR05: ..................................................................................................... S/N ...................................................................................................................
Compressors
Circuit A
Circuit B
1. Model No. ................................................................................................... 1. Model No. ................................................................................................
Serial No. .....................................................................................................
Serial No. ..................................................................................................
2. Model No. .................................................................................................... 2. Model No. ................................................................................................
Serial
No.
......................................................................................................
Serial
No.
..................................................................................................
3. Model No. ....................................................................................................
Serial
No.
......................................................................................................
Air handling equipment
Manufacturer .................................................................................................................................................................................................................................
Model No. .......................................................................................................... Serial No. ........................................................................................................
Additional air handling units and accessories ...................................................................................................................................................................
.............................................................................................................................................................................................................................................................
Preliminary equipment check
Is there any shipping damage? ................................................................. If so, where? ..................................................................................................
.............................................................................................................................................................................................................................................................
Will this damage prevent unit start-up? ..............................................................................................................................................................................
Unit is level in its installation
Power supply agrees with the unit name plate
Electrical circuit wiring has been sized and installed properly
Unit ground wire has been connected
Electrical circuit protection has been sized and installed properly
All terminals are tight
All cables and thermistors have been inspected for crossed wires
All plug assemblies are tight
Check air handling systems
All air handlers are operating
All chilled water valves are open
All fl uid piping is connected properly
All air has been vented from the system
Chilled water pump is operating with the correct rotation. CWP amperage: Rated: ........................... Actual....................