
REV
DATE:
BY:
01
06 OCT 11
REPLACED VERTICAL I-BEAM
WITH 6" X 6" SQUARE TUBE
JAVA
02
20 SEP 12
PER EC-7114; REMOVED CHAMFER FROM 0M-133259
LMG
03
03 JULY 13
ADDED STRUCTURAL NOTE
TTF
04
22 DEC 15
PER EC-22871; ADDED LUBRICANT WARNING
PJS
18704
THE CONCEPTS EXPRESSED AND DETAILS SHOWN ON THIS DRAWING
ARE CONFIDENTIAL AND PROPRIETARY. DO NOT REPRODUCE BY
ANY MEANS WITHOUT THE EXPRESS WRITTEN CONSENT OF
DAKTRONICS, INC. OR ITS WHOLLY OWNED SUBSIDIARIES.
COPYRIGHT 2016 DAKTRONICS, INC. (USA)
THIRD ANGLE PROJECTION
PROJECT:
OUTDOOR SCOREBOARDS
TITLE:
P1647; POLE MOUNTING OPTIONS
DATE:
22-DEC-15
DIM UNITS:
INCHES [MILLIMETERS]
SHEET
REV
SCALE:
1/5
DO NOT SCALE DRAWING
1 OF 1
04
DESIGN:
DOPPELT
JOB NO.
FUNC - TYPE - SIZE
1048184
DRAWN:
DOPPELT
P1647
E - 10 - A
NOTES:
- THREADED RODS RUN ALONG BOTH SIDES OF BEAM
- RODS DO NOT PASS THROUGH THE FLANGES OF THE BEAM
- NO DRILLING NECESSARY
- MAKE SURE SPRING NUT IS PERPENDICULAR TO CHANNEL
OPENING ON SCOREBOARD
***CRITICAL***
DO NOT USE ANY LUBRICANT
ON ANY MOUNTING HARDWARE
OR WARRANTY WILL BE VOIDED
STRUCTURAL NOTES:
- BOLT TORQUE: 30 FT-LB
SIDE VIEW
1/2" FLAT WASHER,
LOCK WASHER, AND NUT
VERTICAL BEAM
1/2" THREADED ROD
SPRING NUT
SCOREBOARD
REAR MOUNTING ANGLE
TOP VIEW
SCALE 1/10
1/2" FLAT WASHER
LOCK WASHER, AND NUT
1/2" THREADED ROD
VERTICAL BEAM
FRONT OF DISPLAY
SPRING NUT
DISPLAY
REAR MOUNTING ANGLE
***CRITICAL***
MAKE SURE SPRING NUT
IS TURNED TO VERTICAL
POSITION INSIDE
SCOREBOARD CHANNEL
REAR ISOMETRIC VIEW
EXTRA THREADED ROD
CAN BE CUT OFF
Содержание FB-2700 Series
Страница 38: ...This page intentionally left blank...
Страница 42: ...This page intentionally left blank...
Страница 47: ......
Страница 50: ......
Страница 56: ...This page intentionally left blank...
Страница 60: ...This page intentionally left blank...