
SiBE061121_A
Pump Down Operation
Trial Operation and Field Settings
119
1. Pump Down Operation
Outline
In order to protect the environment, be sure to conduct pump down operation when relocating or
disposing the unit.
Detail
1) Remove the valve caps from the liquid stop valve and the gas stop valve.
2) Carry out forced cooling operation.
3) After 5 to 10 minutes, close the liquid stop valve with a hexagonal wrench.
4) After 2 to 3 minutes, close the gas stop valve and stop the forced cooling operation.
Refer to page 120 for forced cooling operation.
Gas stop valve
Valve cap
Close
Liquid stop valve
Service port
(R13628)
Hexagonal
wrench
Содержание FVXG25K2V1B
Страница 11: ...SiBE061121_A List of Functions 1 Part 1 List of Functions 1 Functions 2...
Страница 14: ...SiBE061121_A 4 Specifications Part 2 Specifications 1 Specifications 5...
Страница 63: ...SiBE061121_A Remote Controller 53 Part 5 Remote Controller 1 FVXG25 35 50K2V1B 54...
Страница 127: ...SiBE061121_A Check Service Diagnosis 117 RXG50K2V1B RXG50K3V1B R16073 Power module Power module R16692...