
Control Specification
SiBE06-514A
46
Function and Control
Detail
I Judgment by power consumption
When an output frequency is exceeds 55 Hz and the input current is less than specified value,
the adjustment is made for insufficient gas.
II Judgment by discharge pipe temperature
When discharge pipe temperature is 30°C higher than target value and the electronic expansion
value opening is 480 pulses (max.), the adjustment is made for insufficient gas.
III Judgment by the difference of temperature
When the difference of the temperature is smaller than
, it is regarded as insufficient gas.
3.13
Forced Operation Mode
Outline
Forced operating mode includes only forced cooling.
Detail
Forced Cooling
3.14 Additional Function
3.14.1
POWERFUL Operation Mode
Compressor operating frequency is increased to PI Max. (Max. Hz of operating room) and
outdoor unit airflow rate is increased.
3.14.2
Voltage Detection Function
Power supply voltage is detected each time equipment operation starts.
Cooling
room temperature – indoor heat exchanger temperature
4.0°C
outdoor heat exchanger temperature – outdoor temperature
4.0°C
Heating
indoor heat exchanger temperature – room temperature
3.0°C
outdoor temperature – outdoor heat exchanger temperature
3.0°C
Item
Forced Cooling
Forced operation
allowing conditions
1) The outdoor unit is not abnormal
and not in the 3-minute stand-by
mode.
2) The operating mode of the outdoor
unit is the stop mode.
3) The forced operation is ON.
The forced operation is allowed when
the above “and” conditions are met.
Starting/adjustment
If the forced operation switch is
pressed as the above conditions are
met.
1) Command
frequency
68 Hz
2) Electronic
expansion valve
opening
It depends on the capacity of the
indoor unit.
3) Outdoor unit
adjustment
Compressor is in operation.
4) Indoor unit
adjustment
The command of forced operation is
transmitted to the indoor unit.
End
1) When the forced operation switch is
pressed again.
2) The operation is to end
automatically after 15 min.
Others
The protect functions are prior to all
others in the forced operation.
Содержание FVKS25BVMB
Страница 10: ...SiBE06 514A List of Functions 1 Part 1 List of Functions 1 List of Functions 2 ...
Страница 13: ...List of Functions SiBE06 514A 4 List of Functions ...
Страница 14: ...SiBE06 514A Specifications 5 Part 2 Specifications 1 Specifications 6 1 1 Cooling Only 6 1 2 Heat Pump 8 ...
Страница 19: ...Specifications SiBE06 514A 10 Specifications ...
Страница 25: ...Printed Circuit Board Connector Wiring Diagram SiBE06 514A 16 Printed Circuit Board Connector Wiring Diagram ...
Страница 57: ...Control Specification SiBE06 514A 48 Function and Control ...
Страница 85: ...Instruction SiBE06 514A 76 System Configuration ...
Страница 133: ...Check SiBE06 514A 124 Service Diagnosis ...
Страница 154: ...SiBE06 514A Outdoor Unit Removal Procedure 145 When reassembling make sure to fit the hook Step Procedure Points ...
Страница 168: ...SiBE06 514A Others 159 Part 8 Others 1 Others 160 1 1 Test Run from the Remote Controller 160 1 2 Jumper Settings 161 ...
Страница 171: ...Others SiBE06 514A 162 Others ...
Страница 177: ...Wiring Diagrams SiBE06 514A 168 Appendix ...
Страница 181: ...SiBE06 514A iv Index ...