
Indoor Unit
SiBE06-514A
126
Removal Procedure
1. Indoor Unit
1.1
Removal of the
Air Filter
/
Front Panel
Procedure
Warning
Be sure to wait 10 minutes or more after turning off all power supplies
before disassembling work.
Step
Procedure
Points
1
Appearance
Enlarged illustration
shows operation
panel section.
Operation panel
2
Remove the front panel
from the unit.
Push on the left and
right upper parts of the
panel marked with
“PUSH” to open the
front panel.
Содержание FVKS25BVMB
Страница 10: ...SiBE06 514A List of Functions 1 Part 1 List of Functions 1 List of Functions 2 ...
Страница 13: ...List of Functions SiBE06 514A 4 List of Functions ...
Страница 14: ...SiBE06 514A Specifications 5 Part 2 Specifications 1 Specifications 6 1 1 Cooling Only 6 1 2 Heat Pump 8 ...
Страница 19: ...Specifications SiBE06 514A 10 Specifications ...
Страница 25: ...Printed Circuit Board Connector Wiring Diagram SiBE06 514A 16 Printed Circuit Board Connector Wiring Diagram ...
Страница 57: ...Control Specification SiBE06 514A 48 Function and Control ...
Страница 85: ...Instruction SiBE06 514A 76 System Configuration ...
Страница 133: ...Check SiBE06 514A 124 Service Diagnosis ...
Страница 154: ...SiBE06 514A Outdoor Unit Removal Procedure 145 When reassembling make sure to fit the hook Step Procedure Points ...
Страница 168: ...SiBE06 514A Others 159 Part 8 Others 1 Others 160 1 1 Test Run from the Remote Controller 160 1 2 Jumper Settings 161 ...
Страница 171: ...Others SiBE06 514A 162 Others ...
Страница 177: ...Wiring Diagrams SiBE06 514A 168 Appendix ...
Страница 181: ...SiBE06 514A iv Index ...