
Outdoor Unit
SiBE06-514A
146
Removal Procedure
2.2
Removal of Electrical Box
Procedure
Warning
Be sure to wait 10 minutes or more after turning off all power supplies
before disassembling work.
Step
Procedure
Points
Remove the top panel.
Disconnect the connector
for fan motor.
1. Remove the electrical
box.
1
Disconnect the 2
reactor harnesses.
2
Disconnect the relay
connector for
compressor lead wire.
3
Disconnect the
connector for four way
valve
(S80).
When reassembling, coil the
excessive lead wire and
hang the loop on the hook.
Содержание FVKS25BVMB
Страница 10: ...SiBE06 514A List of Functions 1 Part 1 List of Functions 1 List of Functions 2 ...
Страница 13: ...List of Functions SiBE06 514A 4 List of Functions ...
Страница 14: ...SiBE06 514A Specifications 5 Part 2 Specifications 1 Specifications 6 1 1 Cooling Only 6 1 2 Heat Pump 8 ...
Страница 19: ...Specifications SiBE06 514A 10 Specifications ...
Страница 25: ...Printed Circuit Board Connector Wiring Diagram SiBE06 514A 16 Printed Circuit Board Connector Wiring Diagram ...
Страница 57: ...Control Specification SiBE06 514A 48 Function and Control ...
Страница 85: ...Instruction SiBE06 514A 76 System Configuration ...
Страница 133: ...Check SiBE06 514A 124 Service Diagnosis ...
Страница 154: ...SiBE06 514A Outdoor Unit Removal Procedure 145 When reassembling make sure to fit the hook Step Procedure Points ...
Страница 168: ...SiBE06 514A Others 159 Part 8 Others 1 Others 160 1 1 Test Run from the Remote Controller 160 1 2 Jumper Settings 161 ...
Страница 171: ...Others SiBE06 514A 162 Others ...
Страница 177: ...Wiring Diagrams SiBE06 514A 168 Appendix ...
Страница 181: ...SiBE06 514A iv Index ...