![Daikin FTKS20CVMB Скачать руководство пользователя страница 192](http://html1.mh-extra.com/html/daikin/ftks20cvmb/ftks20cvmb_service-manual_3264185192.webp)
SiENBE04-401A
Outdoor Unit / RK(X)S-C, ARK(X)S-C
Removal Procedure
183
2.5
Removal of Four Way Valve
Procedure
Warning
Be sure to wait 10 minutes or more after turning off all power supplies
before disassembling work.
Step
Procedure
Points
1. Remove the peripheries.
Remove the four
way valve and the
sheets of putty so as
not to burn them.
1
Remove the terminal
cover.
Be careful so as not to burn
the compressor terminals or
the name plate.
Make a note.
2
Loosen the screw of the
four way valve coil.
Terminal
cover
Red (U)
Yellow (V)
Blue (W)
Содержание FTKS20CVMB
Страница 19: ...List of Functions SiENBE04 401A 10 List of Functions...
Страница 20: ...SiENBE04 401A Specifications 11 Part 2 Specifications 1 Specifications 12 1 1 Cooling Only 12 1 2 Heat Pump 20...
Страница 45: ...Specifications SiENBE04 401A 36 Specifications...
Страница 81: ...Control Specification SiENBE04 401A 72 Function and Control...
Страница 111: ...Instruction SiENBE04 401A 102 System Configuration...
Страница 155: ...Check SiENBE04 401A 146 Service Diagnosis...
Страница 225: ...Outdoor Unit RK X H C ARK X H C R Y N C SiENBE04 401A 216 Removal Procedure...
Страница 226: ...SiENBE04 401A Others 217 Part 8 Others 1 Others 218 1 1 Test Run from the Remote Control 218 1 2 Jumper Settings 219...
Страница 229: ...Others SiENBE04 401A 220 Others...
Страница 239: ...Wiring Diagrams SiENBE04 401A 230 Appendix...