Pre-Test Run Checks
Part 4 – Commissioning and Test Run
4–5
3
4
5
1
1.3
Water Piping Checks
Checklist
The table below contains the water piping checklist.
Water volume, flow
and pressure
The table below shows the operation range of water volume and water flow for proper operation of the
unit.
The water pressure should not exceed the maximum working pressure of 10 bar.
Step
Check whether...
1
A filter is installed in front of the water inlet of the plate-heat exchanger. The plate-heat
exchangers are sensitive to dirt and small particles.
2
The water volume is within the limits.
3
There is adequate water flow.
4
The water quality meets the standards.
5
The water piping is properly insulated.
6
Measurement points for temperature and pressure are available on the water circuit.
7
The flow switch and pump are properly working.
8
Air purge points are installed on the high parts of the water piping.
9
Drain taps are installed at the low points of the water piping.
10
Other parts of the water circuit are properly mounted and installed (e.g. buffer tank, expan-
sion tank...).
11
Vibration compensators are mounted at the water connections if the unit is positioned on
anti-vibration pads.
Chiller type
Minimum water volume Minimum
water
flow
Maximum water
flow
EUWA*5KBZW1
54 l
16.2 l/min
64.9 l/min
EUWA*8KBZW1
85 l
25.6 l/min
102.5 l/min
EUWA*10KBZW1
108 l
32.2 l/min
128.9 l/min
EUWA*12KBZW1
126 l
37.9 l/min
151.6 l/min
EUWA*16KBZW1
88 l
53 l/min
212 l/min
EUWA*20KBZW1
111 l
67 l/min
267 l/min
EUWA*24KBZW1
132 l
79 l/min
317 l/min
EUWY*5KBZW1
43 l
21 l/min
68 l/min
EUWY*8KBZW1
82 l
31 l/min
106 l/min
EUWY*10KBZW1
100 l
38 l/min
137 l/min
EUWY*12KBZW1
119 l
45 l/min
155 l/min
EUWY*16KBZW1
82 l
61 l/min
212 l/min
EUWY*20KBZW1
100 l
75 l/min
275 l/min
EUWY*24KBZW1
119 l
89 l/min
309 l/min
Содержание EUWAB10KBZW1
Страница 2: ......
Страница 8: ...ESIE11 02 vi Table of Contents 3 1 4 5...
Страница 10: ...Introduction ESIE11 02 viii 3 1 4 5...
Страница 12: ...ESIE11 02 1 2 Part 1 System Outline 3 1 1 5...
Страница 86: ...Wiring Layout ESIE11 02 1 76 Part 1 System Outline...
Страница 88: ...ESIE11 02 2 2 Part 2 Functional Description 3 1 2 5...
Страница 128: ...The Digital Controller ESIE11 02 2 42 Part 2 Functional Description 3 1 2 4 5...
Страница 130: ...ESIE11 02 3 2 Part 3 Troubleshooting 3 1 3 5...
Страница 168: ...ESIE11 02 4 2 Part 4 Commissioning and Test Run 3 1 4 5...
Страница 198: ...Test Run and Operation Data ESIE11 02 4 32 Part 4 Commissioning and Test Run 3 1 4 5...
Страница 200: ...ESIE11 02 5 2 Part 5 Maintenance 3 1 5...
Страница 210: ...ESIE11 02 4 Index 3 1 4 5...